by Admin-bloke » Sat Apr 10, 2010 7:24 pm
As above ^^^^^^^^^
Once it is on, torque the but 30/32mm nut to 168ft lbs (if I remember right)
The enaring has the pre-load built in.
Double check disk run-out with a run out gauge before re-assembling the caliper etc...
I check to 0.1mm max but I think in the D it is 0.2mm (if I remember, just had a beer!)