by InoX » Fri Jan 16, 2015 9:23 pm
The project car is in Bolton
I've done the following:
Frame repaired and powder coated by DMC Europe.
Wheels powdercoated.
pirellis all around
Stainless door bracket thing (the thing that's in the roof) from DMC Europe
New torsion bars (passenger side from DMCH driver's side from Hervey)
new 'sports' radiator (DMC Europe)
new radiator fans (from DMC NW)
SPAX dampers all around
Eibach springs all around
polyeurothane bushes all around
new bearings all around
new upper and lower ball joints (hervey)
new headlights
new fusebox
new dash
brake calipers have been re-built with stainless pots.
new brake discs all around.
new fuel pump and flexible fuel lines (at the pump end)
new fasteners associated with the frame.
all the galvanised braketry has been re-plated and look as good as new.
lower front link arms have been boxed in (in case you're wondering)
the heater box (with new matrix and evaporator) has been re-built.
new rivnuts all around (not something you'd think about - but was a major pain in the rear end for me!)
partial installation of the interior.
engine needs resurrecting/replacing mating with the box and installing.
bumpers need painting and mating
stainless panels need mating and aligned (!!!)
door insides need building up.
pass side door glass needs installing (included along with required seals)
windscreen needs installing
interior needs installing and parts purchased.
sure can you make it after 12.00?