So, what’s new... got the fuel filter finally installed and the shiny new steel braided fuel line that runs to the engine bay.
The reverse switch wiring is repaired and installed, also the tachometer wiring from the distributor is fixed and in place.
Got the firewall and engine bay fiberglass cleaned and treated with some finisher.
The small wiring loom is also repaired and installed, and the bracket is painted in satin black, ready to go back in.
Next up will be installing the main wiring harness in the engine bay. From then on I’ll be getting on with fitting everything that goes into The Valley.