The time for the frame off had come, had been putting it off, but following Eric s great progress on his chassis removal spurred me on
.
so off it had to Come.
I used the same block and wood option for the poor man's hydraulic lift as Eric. Very Labour intensive and me feckin back is in bits! Thankfully Ian was on hand and able to help share the load..
With a 2 post lift it would be a cinch, another magic tool to add to the wish list
The body needs 30 inches to clear the chassis according to my measurements.
The air conditioning lines were a bugger to. Nearly all of them were seized. Steel lines+ aluminum connections +exposed to the elements = not good